For more than 100 years cement mortar has been used as internal corrosion protection for water pipes of steel and ductile iron.
The combination of these 2 components has proved to be a perfect solution – not only regarding the physical and mechanical aspects, also with respect to the corrosion chemical side for pipelines and construction pipes. This report gives a survey on questions that are often discussed in practical use concerning the possibilities and limits for the use of cement mortar linings in the drinking water area.
Copyright: | © Vulkan-Verlag GmbH |
Quelle: | 3R 10 / 2004 (Oktober 2004) |
Seiten: | 0 |
Preis: | € 7,00 |
Autor: | Dr. rer. nat. Hans-Jürgen Kocks Werner Siedlarek |
Diesen Fachartikel kaufen... (nach Kauf erscheint Ihr Warenkorb oben links) | |
Artikel weiterempfehlen | |
Artikel nach Login kommentieren |
Maßnahmen zur Klimaanpassung sächsischer Talsperren
© Springer Vieweg | Springer Fachmedien Wiesbaden GmbH (5/2025)
Die Landestalsperrenverwaltung des Freistaates Sachsen (LTV) betreibt aktuell insgesamt 87 Stauanlagen, darunter 25 Trinkwassertalsperren. Der Stauanlagenbestand ist historisch gewachsen und wurde für unterschiedliche Zwecke errichtet.
carboliq® - Direktverölung gemischter Kunststoffabfälle
© Witzenhausen-Institut für Abfall, Umwelt und Energie GmbH (4/2025)
Die Forderung nach Klimaneutralität dominiert die globale Diskussion über die Zukunft der Industriegesellschaft. Damit einher geht auch die Frage, wie der
Umgang mit Kunststoffen in Zukunft erfolgen wird.
Nutzungskonflikt zwischen Carbon-Capture-Anlagen und Fernwärme?
© Witzenhausen-Institut für Abfall, Umwelt und Energie GmbH (4/2025)
Die EEW Energy from Waste GmbH (EEW) hat sich das Ziel gesetzt, bis 2045 klimaneutral zu werden. Mit 17 Standorten verfügt EEW über eine Verbrennungskapazität von ca. 5 Millionen Tonnen Abfall pro Jahr.