The author Wolfgang H. Stachowitz found the Pusztazámor landfill side in 2004/2005 while looking for landfills that could be financed as Kyoto-mechanism projects (Clean Development Mechanism projects). At the same time, the operator, FKF Zrt., was trying to find suitable gas engineers and consulters for the planning, designing and projecting which should be responsible for the gas extraction system with utilisation, and assist in the implementation of degasification, with longstanding experience in this field. At Easter 2005, the co-operation was started. The Pusztazámor landfill site was first started up with a floor area of approx. 18 ha for the disposal of waste in 2000. The entire future landfill placement area is divided into three segments with four sections each (see Figures 1 to 3).
The Pusztazámor landfill is the largest Hungarian domestic waste landfill site which was built in 2000, employing state-of-the-art technology. The placement of domestic waste started in 2000 and will, in all probability, continue until 2005. In the first of three placement segments, a gas extraction system with a gas booster station and a flare system was started-up in autumn 2006 in one section to be able to design the final gas utilisation plant with regard to the gas quantity and quality. After a test operation (pumping trail) of only 6 months, it turned out that the gas quality is suitable for the utilisation in a gas engine, even in accordance with the strict TA air 2002 requirements. However, the usual West-European gas prognosis models cannot fully be applied to Hungary. The conservative designs and calculations regarding the amount of gas will probably be exceeded by a factor of "1.5 to 2". Reasons for this could be the mild climate and higher water introductions into the landfill body. The effect on the chronological course of the gas production remains to be seen.
Copyright: | © IWWG International Waste Working Group |
Quelle: | Specialized Session F (Oktober 2007) |
Seiten: | 9 |
Preis: | € 9,00 |
Autor: | Dipl.-Ing. Wolfgang H. Stachowitz Gabor Eörsi-Tóta |
Diesen Fachartikel kaufen... (nach Kauf erscheint Ihr Warenkorb oben links) | |
Artikel weiterempfehlen | |
Artikel nach Login kommentieren |
Hochlauf der Wasserstoffwirtschaft
© Lexxion Verlagsgesellschaft mbH (8/2024)
Überblick über und Diskussion der Maßnahmen zum beschleunigten Ausbau
der Wasserstoffinfrastruktur in Deutschland
Die innerstaatliche Umsetzung des Pariser Klimaschutzübereinkommens
- ein Rechtsvergleich
© Lexxion Verlagsgesellschaft mbH (8/2024)
Like all public international law treaties, the Paris Climate Accords rely on national law for their implementation. The success of the agreement therefore depends, to a large extent, on the stepstaken or not taken by national governments and legislators as well as on the instruments and mechanisms chosen for this task. Against this background, the present article compares different approaches to the implementation of the Paris Agreement, using court decisions as a means to assess their (legal) effectiveness.
Klimaschutzrecht und Erzeugung erneuerbarer Energien in der Schweiz
© Lexxion Verlagsgesellschaft mbH (8/2024)
Verschachtelte Gesetzgebung unter politischer Ungewissheit