RECYCLING CENTRES FOR CONSTRUCTION AND DEMOLITION WASTES IN BRAZIL: A STUDY CASE FOR THE CITY OF RIO DE JANEIRO

Only eleven (0.2%) of the 5,507 Brazilian municipalities have C&D waste recycling centres. Thirteen centres (seven in operation, one restarting its operation and five have shut down) are stationary plants and recycle part of the C&D waste produced in local communities. It can, therefore, be concluded that a large part of this waste is not recycled in Brazil. Nonetheless, this situation is changing. Since the publication of CONAMA (Brazilian Environmental Protection Agency) Resolution no. 307 in 2002, all Brazilian local governments are obliged to prepare and adopt strategies for sustainable management of C&D waste (MMA, 2002). In the justifications for this resolution, mention was made of the feasibility of the production and use of C&D waste materials. However, there has been relatively little research in Brazil to prove the technical and economic viability of C&D waste recycling centres.

There are very few construction and demolition (C&D) waste recycling centres in Brazil. Data relating to C&D waste management and recycling in Brazil were collected and analysed to encourage the building and operation of new units. Based on the results of this analysis, a conceptual model was proposed to perform feasibility studies of future C&D waste recycling centres. Applying this model to verify the feasibility of private recycling centres, negative results show that C&D waste recycling centres in current market conditions in Brazil are not financially feasible if based solely on revenue from the sale of processed products. A case study for the city of Rio de Janeiro is discussed. The conceptual model, results of its applications in the city of Rio de Janeiro and their analysis can strongly support public authorities and private initiatives in their decision-making about investments in waste recycling centres in Brazil and in other developing countries.



Copyright: © IWWG International Waste Working Group
Quelle: Specialized Session C (Oktober 2007)
Seiten: 11
Preis: € 11,00
Autor: Kátia Regina Alves Nunes
Prof. Dr. Sc. Claudio Fernando Mahler
Prof. Rogério Valle
 
 Diesen Fachartikel kaufen...
(nach Kauf erscheint Ihr Warenkorb oben links)
 Artikel weiterempfehlen
 Artikel nach Login kommentieren


Login

ASK - Unser Kooperationspartner
 
 


Unsere content-Partner
zum aktuellen Verzeichnis



Unsere 3 aktuellsten Fachartikel

carboliq® - Direktverölung gemischter Kunststoffabfälle
© Witzenhausen-Institut für Abfall, Umwelt und Energie GmbH (4/2025)
Die Forderung nach Klimaneutralität dominiert die globale Diskussion über die Zukunft der Industriegesellschaft. Damit einher geht auch die Frage, wie der Umgang mit Kunststoffen in Zukunft erfolgen wird.

Nutzungskonflikt zwischen Carbon-Capture-Anlagen und Fernwärme?
© Witzenhausen-Institut für Abfall, Umwelt und Energie GmbH (4/2025)
Die EEW Energy from Waste GmbH (EEW) hat sich das Ziel gesetzt, bis 2045 klimaneutral zu werden. Mit 17 Standorten verfügt EEW über eine Verbrennungskapazität von ca. 5 Millionen Tonnen Abfall pro Jahr.

Abfall- und Kreislaufwirtschaft in Deutschland im internationalen Vergleich - Spitzenplatz oder nur noch Mittelmaß?
© Witzenhausen-Institut für Abfall, Umwelt und Energie GmbH (4/2025)
Neben der Umstellung der künftigen Energieversorgung auf ein zu 100 % erneuerbares Energiesystem ist die Abfall- und Kreislaufwirtschaft die zweite zentrale Säule im Rahmen der globalen Transformation in eine klimaneutrale Wirtschaft und Gesellschaft.